PVC Artificial Marble Stone Production Line
(CHE-65/32 Double Screw Extruder)
MACHINE PICTURE
TECHNICAL
QUOTATION
AFTER SALES
Machine Picture:
Configuration & Specification
Item | Equipment | QTY |
1 | CHE-35/25 Former co-extrusion machine | 1 |
2 | CHE-65/132 double screw extruder | 1 |
3 | Feeding machine | 1 |
4 | vacuum calibration | 1 |
5 | Haul off | 1 |
6 | Cutting machine | 1 |
7 | Tilting trestle | 1 |
8 | Hot stamping equipment | 10 |
Specification:
1.CHE-35/25 Former co-extrusion machine
Material | Stainless |

|
Screw Diameter | 114mm |
|
Motor power | 2.2kw |
|
Hopper Volume | 150L |
|
Spiral blade thickness | 2mm |
|
Capacity | 1000kg/h |
|
Power | 1.5kw |
|
Weight | 200kg |
|
2.CHE-65/132 double screw extruder
2.1 Screw

Screw diameter:¢65/132 Motor power:37KW
Max capacity:150-220 kg/h Rotate speed:1-34.7r/min
Screw material:Alloy steel-38CrMoAlA. Nitriding depth:0.5-0.7mm
Surface hardness:≥HV740-940
2.2 Output capacity:70-110kg/H
2.3 Heating zone
Heating power:16KW
Heating way:Aluminum heating coil Temperature control system for barrel:
Heating zone:Cast aluminum heating ring + stainless steel surface coating + cooling fan
Cooling device:The fan with air as medium, provide accurate temperature control Heating zone:4 zones
Total power:16KW
Power or cooling fan:3×550W/set
2.4 Cooling
Cooling system:1/2HP
Cooling zone:3 zones
3.Feeding machine
Feeding power:0.75kw
Hopper material:stainless
4.vacuum calibration

Material of water tank: stainless
Length:6000mm
Height:1100mm
Vacuum pump:5.5KW*2 sets,4KW*set
Water pump:booster pump-4kw 1 set
drainage pump-1.5kw 1 set
Water thermometer- 1 set
pressure gauge- 1 set
Vacuum pump mouth
true air mouth: 24 pics(red mark)
cooling water mouth: 20pics (blue label)
Material of vacuum calibration and cross section form
Motor power:1.5kw
Vortex blower
Power:0.75kw
Move device(front and back)
Motor power:1.5kw
Move device for other directions.
Other two directions to adjust: horizontal gradient sink and finalize the design about position fine-tuning can be manual control
Electrical system
Contact: SCHNEIDER,OMRON relay
5.Haul off

Haul off belt:2pics
Motor power:each haul off machine adopts with reducer(power:0.75kw)
inverter brand:imported ABB inverter
Length of belt:2000mm
Electric Power:380V/50Hz
Haul off speed:0-3m/min
Work pressure:0.5-0.7Mpa
6.Cutting machine


Motor power:2.2KW
cutting blade:450mm
Cutting way:sawing
Working pressure:0.5-0.7MPA
Cutting process:PLC control
7.Tilting trestle

7.1Barrel &screw:
Screw diameter:¢35/25
Power:5.5kw
Material:38CrMoAl
Hardness:>750-850 L/D:25;1
Barrel Surface roughness:Ra≤0.8um
Screw nitriding depth:0.5-0.6mm
Hardness:740-940
Barrel Surface roughness:Ra≤0.8um
7.2 capacity:6-12KG/H
7.3 heating zone
Heating:it adoptscast aluminum heating coil heating, with a stainless steel cover
Power:1.1KW
7.4 cooling
Cooling way:fan
Zone:2 zones
7.5 draught fan
Power:60W×2
7.6 motor & reducer
Reducer power:7.5kw
rotate speed:0-60r/min
Electrical: 3P/380V,50HZ
8.Electrical:


Inverter power:5.5KW
Temperature control:RKC
Temperature control(Japan)
Motor speed control:ABB
Electrical:
Siemens contactor, OMRON relays
9.Hopper:

Material:304 stainless steel Steel
thickness:1.5mm Loading
capacity:25kg
Hopper is adopts with windows, base with a feeding mouth for easy feeding
Equipment list
Item | spare part | qty |
1 | high temperature wire | 10m |
2 | φ8 | 10m/set |
3 | thermocouple | 3 |
4 | cocontactor | 1 pic |
5 | disconnector | 1pic |
6 | nozzle | 5pics |
7 | instruction book | 1 set |
Quotation
Item |
Equipment | QTY | Unit price
(USD) | Total price
(USD) |
1 | CHE-35/25 Former co-extrusion
machine | 1 set | 22,200 | 22,200 |
3 | Vacuum calibration | 1set | 8,400 | 8,400 |
4 | Cutting machine | 1set | 6,400 | 6,400 |
5 | Hot stamping equipment | 10sets | 1,400 | 14,000 |
6 | Tilting trestle | 1 set | 1,600 | 1,600 |
7 | Feeding machine | 1 set | 1,200 | 1,200 |
10 | CHE-65/132 double screw
extruder | 1set | 5,200 | 5,200 |
TOTAL PRICE:59,000USD(FOB SHANGHAI) |
Note:
The configuration may be changed with the actual equipment for the reason of techni cal improvement.
Other terms:
1.Delivery time: within 25 days after 40% deposit is received.
2.Payment: term of T/T, 40% deposit should be paid after contract be signed and 60% shall be paid before the shipment.
3.Guaranty: One year guaranty for the machines and 6 months for the electrical appliance .
4.After-sale service: we not only sell the production line but also offer the whole plant solution such as formula, technology, know how, installation, commissioning, training and operating & maintenance instruction,so called a complete “turn key” project.
For fulfilling the mission one or two technicians from seller side will be dispatched to buyer’s plant until the qualified product is worked out.. Expenses for board&lodging, air ticket and 100USD/day salary Should be paid by buyer.
5.Offer valid time:two months